Flooring · Wimberley, TX
Flooring Installers in Wimberley, TX.
Hill Country paint and floor jobs in Wimberley, Woodcreek, and the surrounding 78676 — premium interior work for second homes and full-time residents.
What we mostly work on here: Hill Country cabins, second homes, and wood-sided properties
What we've learned about Wimberley
Wimberley homes have their own problems.
Wimberley homes are often pier-and-beam with wood subfloor and real seasonal movement — a floating floor handles that far better than glue-down, and getting that call wrong causes buckling. For second homes that sit empty and unconditioned for stretches, we spec materials that tolerate swings in humidity rather than whatever is cheapest per square foot.
See our full flooring processWhat we do in Wimberley
Luxury vinyl plank
Waterproof, scratch-resistant, the best value for most homes.
Hardwood
Engineered and solid — installed, and refinished where it's worth saving.
Tile
Entries, baths, mudrooms, and full-floor runs.
Carpet
Bedrooms and stairs, with demo and haul-away included.
Neighborhoods
Where we work in Wimberley
- Woodcreek
- Woodcreek North
- River Bluff
- Henly
- Saddleridge
Zip codes served: 78676
Questions
Flooring in Wimberley — straight answers.
- How much does flooring installation cost in Wimberley?
- Material choice drives it more than labor does. LVP typically runs $4–$8 per square foot installed, engineered hardwood more, and demo of existing flooring is included in our number rather than added later. We measure on site and quote the whole job — subfloor prep included — so the price you see is the price you pay.
- Do you actually serve all of Wimberley?
- Yes — including Woodcreek, Woodcreek North, River Bluff, Henly, and the surrounding areas (78676). We're based in Kyle, so Wimberley is a short drive — which matters most when you need a touch-up six months after the job.
- Who will be in my Wimberley home?
- Dustin Allan walks the job with you in person before quoting it, and the crew that starts your job is the crew that finishes it. No sales rep hands you off to strangers, and anything you spot in the first 30 days after the final walkthrough we come back and fix at no charge.
- How soon can you start in Wimberley?
- Most Wimberley jobs start within a week of accepting the quote, and most quotes come back the same day you request them. If you're on a deadline — a closing, a move-in, a listing photo date — tell us and we'll say honestly whether we can hit it.
Also need painting in Wimberley?
We do both, and doing them together means one crew, one schedule, and the right order of operations — floors go in after the paint, so nothing gets ruined twice.
Get a Wimberley quote.
Tell us about the project — most quotes back same day. Dustin walks it with you in person.
Or call 512-820-5714